Malaysia to Singapore 2021 High Speed Train Program



The railway will be about 375 km and the travel time will be 90 minutes.[22] The construction cost will be MYR 43 billion. The project will require the construction of a brand-new line with dedicated tracks, which will allow trains to travel at least 270 km/h. MYHSR Corp will co-ordinate the project for the essential construction within the Malaysia corridor, whereas LTA will be in charge for Singapore corridor.

Links :

http://www.myhsr.com.my

https://iskandardevelopment.wordpress.com/tag/high-speed-rail/

http://www.starproperty.my/index.php/articles/property-news/multiplier-effect-of-msia-spore-high-speed-rail-estimated-at-rm20bil-to-rm30bil-likely-to-be-huge/

http://www.iskandar360.com/multitude-of-industries-to-leverage-on-kl-sg-high-speed-rail/

source

Facebook Comments
Share this Top 10 here

Leave a comment

Your email address will not be published.


*